• Compounding Division

  • Barwell ECO20 Preformer

  • Production & Maintenance
  • Tool Room Design & PDC

  • Finishing & Despatching
  • Production Facilties in Plant
       Tool Room Design & PDC
    The Style, fit and finish of a product is determined by the tooling department. So we always take great care of the moulds which are being processed in-house. We regularly follow preventive maintenance for the moulds as per preventive maintenance schedule.

    We have full-fledged tool room equipped with basic machinery to maintain and modify the tools . Recently we have also installed design set up using PRO-E and AutoCAD-2005 software . For the development of the new product our PDC (Product Development Cell) department takes up complete responsibility from concept to design, design to prototyping, prototyping to production stage utilizing in-house as well as subcontracting resources. On an average we are developing tools for about 50 new components every year from well equipped tool makers in Hosur and from Bangalore.

    We involve ourselves totally in the design and manufacturing of the tools conforming the quality as well as timing even though they are sourced from outside tool rooms. Recently our lead-time are 30-40 days for the first off sample, which we are working to minimize further.

    Tool Room Machinery:
    Lathe 1 No.
    Surface Grinding Machine 1 No.
    Drilling Machine 1 No.
    Grinding Machine 1 No.
    In Compliance with ISO 9001:2000 Standard, we follow product Development of Delivery Plan as per the following flow chart.
    Copyright NU-TECH RUBBER PRODUCTS
    Site designed and hosted by Sysmix Infotech